United Pacific Drilling | Hidden Valley
164
portfolio_page-template-default,single,single-portfolio_page,postid-164,ajax_fade,page_not_loaded,,qode-child-theme-ver-1.0.0,qode-theme-ver-2.6,wpb-js-composer js-comp-ver-5.4.5,vc_responsive
 

Hidden Valley

Consistence Performance, Continuous Production

About This Project

Hidden valley project was between 2003-2009. Harmony Gold Limited invited UPD to render both diamond and RC drilling services. About 4 Boart Longyear 70 rigs did the diamond drilling in both Wafi-Golpu and Hidden Valley projects. Our custom built RC rig did the grade control drilling at Hidden Valley open pit with a drilling rate of 600 meters per shift.

Custom Field

Lorem ipsum dolor sit amet

Date

20 November

Category